151 Front St - Major upgrades propel building into new era

As a result of the local market’s high demand for telecommunication space, TrizecHahn Office Properties Ltd. chose to convert its 300,000 s.f.  building at 151 Front Street West to a Class “A” telecommunications hotel carrier. To support tenants’ installation of equipment, such as generators, cooling towers and fuel storage tanks, Jones Lang LaSalle was engaged to manage the base building’s electrical and mechanical systems upgrade process. The project included an aggressive two-phase schedule and a $4 million budget.

A best-in-class project team was assembled to address the challenging task of installing major mechanical and electrical equipment not programmed in the design of the original building. We constructed a riser shaft with diversification, major electrical supply and major HVAC supply to bring all of the systems in the building up to the tenants’ required specifications.
 
Phase I was completed on time and within budget by July 2000.  Phase II was on schedule and completed in March 2001. As a result of the successful upgrade, the landlord was able to maximize income by providing specialized services to each of tenants.

All case studies

 

 

Jlabs @ Toronto/canada/en-ca/case-studies/13/jlabs-torontoJlabs @ TorontoJLabs@ Toronto is the fit-out of one floor at the MaRS Centre Phase 2 tower, located at 661 University Avenue.
MaRS 15 & 16/canada/en-ca/case-studies/14/uoft-medicine-laboratory-fit-out-at-marsMaRS 15 & 16The fit-out of the 15th and 16th floors of the MaRS Centre Phase 2 tower.
Biolab Reno Project/canada/en-ca/case-studies/15/uoft-biolab-reno-projectBiolab Reno ProjectRenovation of the Biology teaching laboratories located on the 4th floor of the William G. Davis building.
Facility Redevelopment Program/canada/en-ca/case-studies/17/facility-redevelopment-programFacility Redevelopment ProgramTherapure Biopharma Inc. undertook a major renovation of their existing pharmaceutical manufacturing facility located in Mississauga, Ontario.
N-Viro Bio Solids Project/canada/en-ca/case-studies/18/n-viro-bio-solids-projectN-Viro Bio Solids ProjectThis facility was the first P3 Project of its size in Ontario and was designed to handle up to 15,000 wet tonnesof dewatered biosolidsper year produced by the City of Greater Sudbury (CGS).
TBEP/canada/en-ca/case-studies/16/tbepTBEPThe University of Toronto (U of T) fitted out the 14th floor of the MaRS Centre Phase 2 tower, located at 661 University Avenue, to better accommodate the growing research laboratory needs of the Translational Biology and Engineering Laboratories Project (TBEP).
Lalor Mine Project/canada/en-ca/case-studies/19/lalor-mine-projectLalor Mine ProjectThe LalorMine included a 950m production shaft, a 750m ventilation shaft, a 2.5km ramp, headframe, hoist house, and other support infrastructure.
Research and Learning Tower/canada/en-ca/case-studies/20/sickkids-research-and-learning-towerResearch and Learning TowerThe Hospital for Sick Children (SickKids) is a state-of-the-art research facility built for the purposes of collaborative and interactive interdisciplinary research.