Skip Ribbon Commands
Skip to main content

JLL Projects

Latest case studies

 

 

Jlabs @ Toronto/canada/en-ca/case-studies/13/jlabs-torontoJlabs @ TorontoJLabs@ Toronto is the fit-out of one floor at the MaRS Centre Phase 2 tower, located at 661 University Avenue.
MaRS 15 & 16/canada/en-ca/case-studies/14/uoft-medicine-laboratory-fit-out-at-marsMaRS 15 & 16The fit-out of the 15th and 16th floors of the MaRS Centre Phase 2 tower.
Biolab Reno Project/canada/en-ca/case-studies/15/uoft-biolab-reno-projectBiolab Reno ProjectRenovation of the Biology teaching laboratories located on the 4th floor of the William G. Davis building.
Facility Redevelopment Program/canada/en-ca/case-studies/17/facility-redevelopment-programFacility Redevelopment ProgramTherapure Biopharma Inc. undertook a major renovation of their existing pharmaceutical manufacturing facility located in Mississauga, Ontario.
N-Viro Bio Solids Project/canada/en-ca/case-studies/18/n-viro-bio-solids-projectN-Viro Bio Solids ProjectThis facility was the first P3 Project of its size in Ontario and was designed to handle up to 15,000 wet tonnesof dewatered biosolidsper year produced by the City of Greater Sudbury (CGS).
TBEP/canada/en-ca/case-studies/16/tbepTBEPThe University of Toronto (U of T) fitted out the 14th floor of the MaRS Centre Phase 2 tower, located at 661 University Avenue, to better accommodate the growing research laboratory needs of the Translational Biology and Engineering Laboratories Project (TBEP).
Lalor Mine Project/canada/en-ca/case-studies/19/lalor-mine-projectLalor Mine ProjectThe LalorMine included a 950m production shaft, a 750m ventilation shaft, a 2.5km ramp, headframe, hoist house, and other support infrastructure.
Research and Learning Tower/canada/en-ca/case-studies/20/sickkids-research-and-learning-towerResearch and Learning TowerThe Hospital for Sick Children (SickKids) is a state-of-the-art research facility built for the purposes of collaborative and interactive interdisciplinary research.