Skip Ribbon Commands
Skip to main content

Higher Education Projects

Working through your next campus project.

We’ve worked extensively with a number of post-secondary educational institutions, and understand the unique constraints and challenges they face throughout capital project development. We’re here to help you with:

  • Design team procurement
  • Programming and design development management
  • Budget development and control
  • Construction team procurement
  • Construction and contract administration management
  • Schedule development and control
  • Equipment procurement
  • Transition and move management

 

Higher Education Projects

 

 

Havergal Junior School Expansion/canada/en-ca/case-studies/32/havergal-junior-school-expansionHavergal Junior School ExpansionHavergal College is developing a master plan of their complete campus in line with their new strategic vision and goals for the school.
Sheridan College Hazel McCallion Campus Expansion/canada/en-ca/case-studies/34/sheridan-college-hazel-mccallion-campus-expansionSheridan College Hazel McCallion Campus ExpansionThe Sheridan College expansion project involved designing and constructing a new facility on the existing Hazel McCallionCampus in Mississauga.
Jlabs @ Toronto/canada/en-ca/case-studies/13/jlabs-torontoJlabs @ TorontoJLabs@ Toronto is the fit-out of one floor at the MaRS Centre Phase 2 tower, located at 661 University Avenue.
MaRS 15 & 16/canada/en-ca/case-studies/14/uoft-medicine-laboratory-fit-out-at-marsMaRS 15 & 16The fit-out of the 15th and 16th floors of the MaRS Centre Phase 2 tower.
Biolab Reno Project/canada/en-ca/case-studies/15/uoft-biolab-reno-projectBiolab Reno ProjectRenovation of the Biology teaching laboratories located on the 4th floor of the William G. Davis building.
TBEP/canada/en-ca/case-studies/16/tbepTBEPThe University of Toronto (U of T) fitted out the 14th floor of the MaRS Centre Phase 2 tower, located at 661 University Avenue, to better accommodate the growing research laboratory needs of the Translational Biology and Engineering Laboratories Project (TBEP).
Mission 2050/canada/en-ca/case-studies/28/mission-2050Mission 2050Unprecedented globally, Mission 2050 (M2050) was planned to establish an integrated agri-ecology campus for dairy, poultry, and swine research, as well as technological development, innovation, and knowledge transfer.
500 University Ave. Renovations/canada/en-ca/case-studies/29/500-university-renovartions500 University Ave. RenovationsThe Department of Family and Community Medicine (DFCM), at the University of Toronto, St. George Campus (U of T).